· Basics of Integration Designer.
· IBM WebSphere MQ with IBM BPM.
Recognized by supervisors
as an excellent coordinator between offshore and onshore mode of working.
Excel within highly competitive environments.
Worked with the team
members and developed the 4 modules for our project efficiently. I was also
involved in the client meetings, requirement gathering and designing the
modules & Demos before the development and plugging it into the project
environment.
TECHNOLOGIES:
DATABASES:ORACLE, SQL.
GUI/TOOLS:IBM
BPM 8.5, 7.5 LOMBARDI TEAM WORKS 6.22, JBOSS, JAVA, WEB SERVICES, JAVASCRIPT,
JSP, and HTML.
APPLICATION MONITORING
TOOL:DYNATRACE.
PLATFORMS:WINDOWS XP, 7.
TESTING TOOLS:MERCURY.
CHANGE MANAGEMENT TOOLS:HARVEST,
SERENA CHANGEMANDS.
CERTIFICATIONS:
· IBM C2180-276: IBM BUSINESS
PROCESS MANAGER EXPRESS OR STANDARD EDITION V8.0, BPM APPLICATION DEVELOPMENT
(2014)
· IBM C2180-186 IBM BPM EXPRESS OR
STANDARD EDITION V7.5.1, BPM APPLICATION DEVELOPMENT.(2014)
· IBM 000-169: IBM BPM BLUEPRINT:
IBM WEBSPHERE LOMBARDI EDITION V7.1, ADMINISTRATION(2013)
· IBM 000-170: IBM BPM BLUEPRINT:
IBM WEBSPHERE LOMBARDI EDITION V7.1, PROCESS FUNDAMENTALS(2013)
· IBM 000-171: IBM BPM BLUEPRINT:
IBM WEBSPHERE LOMBARDI EDITION V7.1, DEVELOPMENT(2013)
· IBM 000-173: IBM BPM BLUEPRINT;
IBM WEBSPHERE LOMBARDI EDITION V7.1, APPLICATION DEVELOPMENT(2013)
EDUCATION:
Bachelors of Engineering
(Information Technology), Babasaheb Ambedkar Marathwada University,
Aurangabad, India
PROFESSIONAL
EXPERIENCE:
PECO: An Exelon Company Philadelphia, PA
OCT 2014 – PRESENT
BPM Senior Designer,
Developer
· Designing and developing BPM
application for PECO users to take an action on energy meters remotely.
· IBM BPM Advanced 8.5.5 is used to
take actions (Remote Restart, Cut Meter).
· Designing the workflow in IBM
Integration Designer and IBM Process Designer 8.5.5 Version.
· Working in an Agile Methodology of
delivery.
· Optimization of the current IBM
BPM 8.5.5 Artifacts.
· Re-routing and injecting tokens by
using the REST services.
· Reporting / Dashboards exposed to
users.
· Deploying and un-deploying the
Snapshots on Process Server Environments (Online and Offline).
· Design and build the User
Interfaces by using the Coach Views in IBM BPM 8.5.5.
· BPEL and BPD Instance Migration
from old snapshot to new snapshot.
· IBM
Integration Designer (IID) developed Rule Groups and Rule Sets and Assembly
Diagrams.
· IBM
Case Manager, created one POC for High Bill complaints which will be used to
review the complain.
· Service
Component Architecture/SOA, created Advanced Integration Services which will
be used to communicate the artifacts in IID and in BPD.
· Worked
on Coach Views (Dojo 1.7) and also created coaches by using JavaScript.
· Designed and wrote business rules
using Integration Designer.
· Configured IBM BPM WebSphere MQs
and Integrated BPM with IBM MQ.
· Mediation Module, for invoking the
webservice from the BPEL process.
PNC Financial Services Group Cleveland, OH
Mar 2012 – SEP 2014
BPM Senior Designer,
Developer
· Designing, Enhancing and
Developing 3 big BPM applications for thousands of users. Discovered couple
of gaps in the system and designed and developed the utility services /
processes / Toolkits for all these three applications using Teamworks.
· The utility services / Toolkits
are being used by all users for multiple functionality till date which
reduced the support time and processing of the applications providing extreme
help for all the users.
· Discovering the gaps between the
applications with respect to user’s functionality.
· Design and discovered gaps to
build a utilities for business users to increase efficiency.
· Working in an Agile Methodology of
delivery.
· Simulation and Optimization by
creating and investigating hotspots and running processes by using historical
data.
· Re-routing and injecting tokens by
using the REST services.
· Reporting by creating the
graphical representation(Graphs, Charts) of the performance data.
Highlights:
· One of the examples of the utility
service / Toolkit is termination framework, which terminates all the apps
which are processed manually by users because of some technical issue or
inadequate business data. To terminates these apps using this framework users
have to manually pull out applications and terminate all the processed apps.
To terminate all the applications manually it takes more times so the utility
services saved lot of time and helped users. Developed User Training Guides.
PNC Financial Services Group Pune, India JAN
2011-FEB 2012
BPM Developer, Team Lead
· Develop an Application for lending
for customer of PNC.
· Understand the business
requirement and build the technical design by using IBM BPM 7.5 PD.
· Design Standard Screens for users
to interact with the Application.
· Work with clients during UAT phase
by explaining the application in detail.
· Develop PL/SQL and UNIX scripts as
required.
Highlights:
· Provided solution within a short
period of time. (Pre-Production).
· Worked closely with the users to
ensure efficient and timely fixes.
PNC Financial Services Group Pune, India JUL 2008- DEC
2010
BPM Developer, Module
Lead
· Working with the DBA (Client) to
build the generic queries and database views.
· Designing & Developing modules
for the application.
· Designed and Developed 4 modules.
Highlights:
· Client Appreciation for creating
database views and queries.
· Start of the quarter award.
Linked In: https://www.linkedin.com/pub/amar-kharate/21/965/61